How Long Does A Bathroom Remodel Take?

How Long Does A Bathroom Remodel Take?

Here's The General Timeline For A Bathroom Remodel

  1. Planning and Design Phase:

    • Duration: 1-4 weeks
    • Includes: Initial consultations with contractors, design planning, material selection and appliance selection, and ordering supplies.
  2. Demolition:

    • Duration: 1-2 days
    • Includes: Removing old fixtures, ripping out old tiles, flooring, and any necessary demolition work.
  3. Plumbing and Electrical Work:

    • Duration: 2-4 days
    • Includes: Rerouting or updating plumbing and electrical systems to accommodate new fixtures and ensure they meet code requirements, and roughing in any new drains.
  4. Framing and Structural Work (if needed):

    • Duration: 2-3 days
    • Includes: Any necessary framing or structural changes to the bathroom layout, like making an alcove for a bathtub.
  5. Installing Drywall and Backer Board:

    • Duration: 1-2 days
    • Includes: Installing new drywall and cement backer board for areas that will be tiled.
  6. Tiling and Flooring:

    • Duration: 3-7 days
    • Includes: Laying floor tiles, wall tiles, and grouting. The drying time for adhesives and grout can also add to the duration.
  7. Installing Fixtures:

    • Duration: 1-2 days
    • Includes: Installing new fixtures such as the bathtub, shower, toilet, sink, and any cabinetry.
  8. Painting and Finishing Touches:

    • Duration: 1-3 days
    • Includes: Painting walls, installing trim, and completing any other finishing touches.
  9. Inspection and Final Walkthrough:

    • Duration: 1 day
    • Includes: A final inspection to ensure everything meets code and a walkthrough with the contractor to address any last-minute adjustments. 

Total Estimated Time

  • Standard Remodel: 2-4 weeks
  • Extensive Remodel: 4-8 weeks or longer

While the average bathroom remodel takes 2 to 8 weeks, planning for potential delays and having a clear timeline with your contractor can help ensure the project stays on track.

It's essential to communicate regularly with your contractor and address any concerns promptly to avoid unnecessary delays. If you are ordering a whirlpool bathtub, it is smart to coordinate with your contractor to have it arrive before the time of completion.

    Back to blog